Daleville planning guide

How Do You Keep Access Open Between Hardscape Phases?

This guide answers how a first hardscape phase in Daleville, Virginia can stay useful for walking and still leave a route for the equipment and materials a later phase will need. It is for yards with one side gate, a narrow slot beside the house, or a new patio that could accidentally become a wall across that slot. The outcome is a marked lane that this phase does not pave, plant, or fence shut.

What counts as access, and what does not?

Access is a continuous route from the street or driveway to the future work area, wide enough for the method you expect, and free of finished work you are unwilling to remove. A pretty walk that fills the slot is not access for a later machine. A grass lane that stays open is access, even if it is muddy in March, as long as you accept that mud. The walking surface people need every day can be a different line from that lane, or the same line if it is built to be crossed by the later work.

The walking surface itself, including steps, is specified on the walkways and steps page. This article is only about not losing the route.

When is the first phase most likely to close the lane?

The usual closures are a patio that runs fence to fence, a retaining wall with no opening, a new fence on the gate line, and foundation plantings set where pallets would land. Each one is reasonable on its own. Together they strand the back yard. Draw the later work area first, then draw the lane backward to the street, then place this phase's patio so it does not sit on that line unless the patio is the lane and is detailed for it.

If the patio is the project people will use now, keep it. Just stop it short of the lane, or choose a surface on the lane that you are willing to protect or lift. Patio layout is on the first-phase patio page.

Why do local lots make a single lane more important?

County Community Development describes the Gateway Crossing area at Interstate 81 exit 150 as the primary southern entrance to the county and a center of growth. Newer lots in a growth area are often smaller side yards than an older rural parcel, which means one slot beside the house may be the only slot. That is a pattern to check on your plat, not a fact about every address. The zoning page points owners to county GIS for parcel, zoning, and floodplain layers, with the warning that the map is not guaranteed and is not a survey. Open Botetourt County WebGIS for that picture, then confirm lines before anyone drives near a boundary.

The comprehensive-plan environmental chapter's 0 to 8 percent slope class for land around Daleville does not create a wide gate. Slope and width are different measurements. A gentle yard with a 36-inch gate is still a hand-carry yard.

How should drainage and the lane share the same ground?

The equipment lane is often the low side of the yard, which is also where patio and downspout water want to go. Paving the lane into a dam, or using it as an undefined ditch, causes the next phase to start with a repair. Give water an outlet that does not depend on driving through a pond, and do not send that outlet into a closed depression that might be related to the valley limestone the comprehensive plan describes. If the lane crosses a mapped floodplain, the permit conversation changes. That check is on the Botetourt permits page.

What photos make the lane obvious in a request?

Stand at the street and photograph the gate. Stand at the gate and photograph the future work area. Put a tape across the narrowest point. Mark the lane on a sketch and write "do not block" on it. Note anything already in the lane: AC units, hose bibs, meters, and downspouts. Virginia 811 still has to locate utilities before the later phase digs. The lane drawing does not replace that ticket.

The home page is where the sketch becomes a request.

Sources named on this page were read on October 9, 2026. An office can revise a rule after that date, so confirm the current text before anyone digs.

Daleville questions

Frequently asked questions

Is a person-width gate enough for a later patio?

It is enough for hand work and for many repairs. It is not the same as access for pallets or a small machine. If the later phase is large, say so now. A provider can tell you whether that gate forces hand work, which belongs in the scope rather than as a surprise.

Can the walking path and the equipment path be the same strip?

Yes, if that strip stays strong enough and is not planted or fenced shut between phases. A paver walk can be the lane if it was built for the load and if its edge can be protected. A decorative stepping-stone path usually cannot.

What if the only lane crosses a neighbor's side?

Do not assume a neighbor's yard, a utility easement, or a common area is available. County GIS can show parcel lines as a starting picture, and the county says that picture is not a legal description. A current survey is the document that shows where you may actually drive.

Does Gateway Crossing's walkable-street language change a backyard lane?

The overlay, adopted in 2022, is about the exit 150 growth area and pedestrian-oriented design on development sites. It is not a rule for a single backyard path. Confirm whether the parcel is even in the overlay before you treat it as relevant. A backyard equipment lane is still a practical question either way.